The photographed build has two forward-facing rows and a rear-facing last bench.实拍配置有两排前向座椅,最后一排为后向长椅。

Reference build shown; final equipment is agreed for each order.图片为参考实拍配置;最终设备以每笔订单确认内容为准。
Pictured platform · configuration on request实拍车型平台 · 按需确认配置
6-Passenger 4+2 Rear-Facing Golf Cart Platform六座 4+2 后向座椅高尔夫球车平台
A mixed-direction six-seat layout for group travel where a rear-facing bench is acceptable. The separate rear step affects where passengers should board.适合可接受后向座椅的六人小组出行。独立后踏板会影响停车点的上下车安排。
- Visible layout图示布局
- 4 forward + 2 rear-facing四座前向+两座后向
- Buyer fit适用采购需求
- Resort, estate and attraction teams that want six seats without requiring every guest to face forward.不要求每位乘客都面向前方的度假村、园区及景点接待。
- Final specification最终规格
- Confirmed for the quoted build按报价配置确认
Where this layout fits布局适用场景
Resort, estate and attraction teams that want six seats without requiring every guest to face forward.不要求每位乘客都面向前方的度假村、园区及景点接待。
The six-passenger shuttle shows three forward-facing rows and a flatter central deck; it is the alternative when seating direction or stop frequency is decisive.六座接驳平台采用三排全前向座椅与较平坦的中部地板;乘坐方向或站点频次关键时可比较。
Compare this product family →比较同类车型 →What the photo establishes照片能够确认的内容
Visible design details可见设计细节
The reference image supports the layout description below. It does not establish a fixed motor, range or market approval for every future build.参考图片支持以下布局描述,但无法证明所有未来配置的固定电机、续航或目标市场准入。
An extended dark roof, rear step and side foot area are visible.图中可见深色延长车顶、后踏板及侧面脚踏区。
Configure for the job按工作场景配置
Decisions to make before quotation报价前需要明确的条件
Color, seating trim, wheels, roof, power system, accessories and branding can be discussed. Availability and compatibility are confirmed together for your selected version.可讨论车色、座椅面料、轮圈、车顶、动力、附件和品牌标识。是否可供货及相互兼容,需按所选版本统一确认。
Explore customization →查看定制服务 →- Plan separate boarding clearance at the side and rear of each stop.每个站点都要规划车辆侧面及车尾的上下车空间。
- Check route grade and tire requirements against the actual loaded configuration.按实际满载配置核对坡度和轮胎需求。
Specification review规格审核
What the final build sheet must confirm最终配置单必须确认的内容
No single numeric specification can honestly describe every motor, battery, tire and body combination. Ask for one dated sheet tied to your exact quotation.不同电机、电池、轮胎与车身组合无法由同一组数值准确描述。请索取与具体报价绑定、注明日期的配置单。
| Field项目 | How it is confirmed确认方式 |
|---|---|
| Photographed layout实拍布局 | 4 forward + 2 rear-facing四座前向+两座后向 |
| Power system, battery and charger动力系统、电池与充电器 | Specified for the proposed build and destination power supply.按建议配置和目的地电源条件确定。 |
| Overall size and turning clearance整车尺寸与转弯空间 | Confirmed from the selected body, roof and wheel package.按所选车身、车顶及轮胎方案确认。 |
| Rated load and passenger / cargo limit额定载荷与载客或载货上限 | Provided for the exact approved configuration.针对最终确认配置提供。 |
| Brakes, tires and suspension制动、轮胎与悬架 | Matched to the intended surface, load and operating route.按预定路面、载荷和运营路线匹配。 |
| Speed, range and grade速度、续航与爬坡 | Reported with battery, load, terrain and test conditions—not as universal photo-based claims.连同电池、载荷、地形和测试条件说明,不凭照片给出统一数值。 |
| Market documents and identification目标市场文件与车辆识别 | Checked against the selected version and destination rules before order approval.下单前按所选版本和目的地要求核对。 |
Public-road eligibility, local registration and document scope depend on the destination and exact vehicle version. Confirm these before ordering.公共道路使用资格、当地登记和文件适用范围取决于目的地及具体车辆版本;下单前须核实。
Wholesale planning批量采购规划
A usable quote needs the operating context有效报价需要实际使用条件
Tell us the destination country, quantity, intended routes and required equipment. We can then confirm the compatible build, packing method, lead-time basis, parts support and order terms.请告知目的国家、数量、预定路线和设备需求。我们才能确认兼容配置、包装方式、交期起算、配件支持和订单条款。
Read wholesale process →查看批量采购流程 →- 1. Share requirements1. 提供需求
Platform, quantity, destination, route or cargo, and preferred equipment.车型平台、数量、目的地、路线或货物及设备偏好。
- 2. Review one build sheet2. 审核一份配置单
Check the exact version, test conditions and applicable paperwork.核对具体版本、测试条件和适用文件。
- 3. Approve order and shipment plan3. 确认订单与运输方案
Finalize packing, production milestones and acceptance evidence.敲定包装、生产节点和验收依据。
Questions about this layout关于此布局的常见问题
Before you shortlist it加入候选清单之前
Is the last row rear-facing?最后一排是后向的吗?
Yes, in this pictured 4+2 layout. Select the six-passenger shuttle platform if all three rows need to face forward.图示 4+2 布局的最后一排为后向。如需三排都面向前方,请选择六座接驳平台。
What is the loaded climbing capability?满载爬坡能力是多少?
It depends on the chosen drive system, battery, tire package and load. We provide the applicable figure and test conditions with the quoted build.取决于动力系统、电池、轮胎和载荷。报价配置将附对应数值和测试条件。
Start with your route and quantity从路线与采购数量开始
Request a build-specific quotation获取针对实际配置的报价
Share the destination country, expected quantity, route or cargo, and preferred layout. We will confirm the compatible configuration and its current specification before quoting.请提供目的国家、预计数量、路线或货物信息及期望布局。我们会先确认兼容配置和当前规格,再给出报价。
Request a quote for this platform询问此平台报价
